97碰人人胔 在线综合亚洲欧美青青,国产成人人精品三级在线,榴莲视频在线观看视频 1080P,麻豆保洁员上门服务免费,男男AV纯肉无码免费播放无码

歡迎訪問衡水中(zhong)景機械設備有限公司網站 鋼筋(jin)套(tao)筒 直螺紋套(tao)筒 冷擠(ji)壓(ya)套(tao)筒 鋼筋(jin)滾絲機! 網站首頁 | 網站地圖 |
熱門關鍵詞: 鋼筋連接套筒 直螺紋鋼筋套筒 冷擠壓鋼筋套筒 可焊接鋼筋套筒 變徑鋼筋套筒 灌漿套筒
欄目導航
咨詢熱線(xian):
新聞中心

您的位置:首頁>>新聞中心

ZJ-50小霸王鋼筋直螺紋滾絲機使用說明書

作者(zhe):超級管(guan)理員來(lai)源:本站(zhan)發(fa)布時間:2024-11-12 15:17:04點(dian)擊數:0 次

ZJ-50小霸王鋼(gang)筋直螺紋滾絲機使用(yong)說明書

型(xing)號

Model

ZJ-50

鋼筋直徑范圍

rebar diameter range

Ф12-Ф40mm

主電機功率

Main motor power

7.5KW

**螺紋長度

maximum thread length

90mm

配用電源

Power supply

380V

       

weight

320KG

電源頻率

Power frequency

50HZ

廠(chang)

factory number

0205009

主(zhu)軸轉速

Spindle speed

73r/min

出(chu)

 factory date

2024年(nian)6

June 2024

 image.png

 

設備安全操作注意(yi)事項(xiang):

Precautions for safe operation of equipment:

鋼(gang)筋剝肋滾絲(si)機在使(shi)用過程中應(ying)注意以下安全(quan)事項:

The following safety precautions shall be paid attention to during the use of the rib stripping and rolling machine:

 

1、施工人員必須進行(xing)技術培(pei)訓,經(jing)考核合格(ge)后方可持證上(shang)崗操作。

1. Construction personnel must be provided with technical training and can only work with certificate after passing the examination.

2、設(she)備電(dian)源必須有(you)漏電(dian)保護(hu)裝(zhuang)置;本機必須有(you)可靠的接地操作,防(fang)止漏電(dian)傷(shang)人;設(she)備停用后(hou)應切斷設(she)備電(dian)源。

2. The power supply of the equipment must have leakage protection device; the machine must have reliable grounding operation to prevent the leakage from hurting people; the power supply of the equipment shall be cut off after the equipment is out of service.

3、滾(gun)絲(si)(si)頭滾(gun)到前(qian)限位后不停機時應(ying)立即(ji)切斷電源,不要(yao)用手去阻止滾(gun)絲(si)(si)頭轉動。

3. The power supply shall be cut off immediately when the rolling head does not stop after rolling to the front limit position. Do not use hands to prevent the rolling head from rotating.

4、滾(gun)絲(si)頭在運轉(zhuan)(zhuan)過程中手不得觸摸任何轉(zhuan)(zhuan)動部(bu)件(jian),如:滾(gun)絲(si)頭、脹(zhang)刀觸頭等(deng)。

4. The rolling head shall not touch any rotating parts during operation, such as the rolling head, expanding knife contact, etc.

5、設備維(wei)修必(bi)須有專門人(ren)員進(jin)行,不得私(si)自進(jin)行維(wei)修,改裝(zhuang)。

5. The equipment maintenance must be carried out by special personnel, and it is not allowed to carry out maintenance or modification without permission.

6、設備(bei)在接(jie)通電(dian)(dian)源后不得用手觸(chu)摸任何帶電(dian)(dian)電(dian)(dian)器件,以防觸(chu)電(dian)(dian)。不得讓水等具有導(dao)電(dian)(dian)能力的(de)物質(zhi)進行電(dian)(dian)器箱(xiang)。

6. After the equipment is connected to the power supply, it is not allowed to touch any live electrical parts by hand to prevent electric shock. Do not allow water and other conductive materials to carry on the electrical box.



相關文章